Stories
Best Of
22.10.2026
/
Austria
Top 5: Eye-catching Roof Structures
Building construction
23.09.2026
/
Austria
PORR LIVING: Affordable Housing with a System
Best Of
17.09.2026
/
Austria
Top 5: Contemporary Theatres
Best Of
09.09.2026
/
Austria
Top 5: Futuristic Architectural Utopias
Best Of
27.08.2026
/
Austria
Top 7: Energy-efficient Office Buildings
Civil engineering / Infrastructure
19.08.2026
/
Austria
Road construction: Szymon and the S 10
Special competencies
04.08.2026
/
Germany
The Olympia Anchor: Innovative and sustainable
Best Of
30.07.2026
/
Austria
Top 5: Fabriken neu genutzt
Best Of
12.06.2026
/
Austria
Top 3: Healing Architecture
Best Of
02.06.2026
/
Austria
Top 5: Sculptural Architecture
Special competencies
18.05.2026
/
Germany
Airport Construction: Precision Landing in Mannheim and Bucharest
Civil engineering / Infrastructure
05.05.2026
/
Austria
ElbX: Underwater Tunnel Construction
Best Of
23.04.2026
/
Austria
Top 5: Living in a Tower
Best Of
14.04.2026
/
Austria
Top 5: Shopping Malls
WORLD OF PORR
The Construction Magazine.
#worldofporr