5. Martin Luther’s ChurchAustria
The 300 m² church in Hainburg, Lower Austria, was built to a design by the architect Wolf D. Prix and engineered by Coop Himmelb(l)au. It opened in 2011 after a construction period of just nine months. Three skylights in the roof – symbolising the Trinity of the Christian God – create a special atmosphere inside the church. The complex construction required the specialist expertise and technologies of a North German shipyard, which fabricated the roof. It was then delivered to Hainburg in four separate sections, assembled, welded and coated. The self-supporting steel structure with its stucco ceiling, together with the uniquely shaped bell tower, makes the Martin Luther Church an architectural eye-catcher in tranquil Hainburg.
4. Hotel Marqués de Riscal Spain
The Hotel Marqués de Riscal, situated in the small wine-growing village of Elciego in Spain, was designed by star architect Frank O. Gehry. It was officially opened in 2006. The hotel comprises two restaurants, a rooftop lounge overlooking the village of Elciego, a wine bar, a wine shop, conference and banquet facilities, as well as 43 rooms and ten suites. The two sections of the building – the Gehry wing and the Spa wing – are connected by a glass-roofed bridge. With its strikingly curved roof and cladding of titanium and stainless steel, the building could hardly be more eye-catching. It makes a bold statement for modernity in an otherwise rather traditional region.
3. Residential building in BarreiroPortugal
Architect Aires Mateus has designed the roof of this house in Barreiro, Portugal, to be strikingly unobtrusive. It connects two former warehouses to form a detached house. The roof terrace, with a swimming pool at its centre, serves as a meeting place and a spot to relax. The minimalist, strictly geometric forms in brilliant white make the roof an extraordinary structure set against a backdrop of brick walls and red-tiled roofs.
2. Vienna Central StationAustria
The modernisation of Vienna’s former Südbahnhof into Vienna Central Station has also given rise to an unusual roof structure. The diamond-shaped roof spans the platforms and presented a structural challenge. Each panel, with its unique shape, had to be fitted together like a jigsaw piece to form a whole. The result is a seemingly weightless structure made of steel and glass, which lets in plenty of light and provides shelter from the rain. Visually, the roof nestles over the transport hub like a gentle wave. The technical refinements are also noteworthy: built using BIM and fitted with sensors in the roof support structure, the construction continuously provides data on deformation, temperature and load, which is analysed by AI. This enables precise, efficient maintenance and the timely detection of damage to the structure. The result is therefore an eye-catching and smart roof structure based on designs by Theo Hotz Partner. As part of a joint venture, PORR played a key role in implementing the extensive construction works at the station.
1. Sydney Opera House Australia
When it comes to eye-catching roof structures, there can only be one winner: the world-famous Sydney Opera House, designed by the Danish architect Jørn Utzon. Opened in 1973, it has been listed as a UNESCO World Heritage Site since 2007. The building is 184 metres long and 118 metres wide. Its roof rises 67 metres into the air and is clad with 1.1 million glazed, white, glossy ceramic tiles. 580 piles, anchored 25 metres deep into the ground, support the opera house, which weighs around 160,000 tonnes. The curved shells of the roof and their complex geometry represented a breakthrough in architecture. The computers, controlled by punch cards, are said to have taken 18 months to calculate the curvatures and the structural analysis of the roof construction. According to eyewitness accounts, 44 draughtsmen produced more than 1,700 plans – for the roof alone. And that is what makes the Sydney Opera House an icon of modern architecture.